RRECKTEKTransitAll sample reports
Sample report · illustrative data · not a real fleet

Funding sources

October · 6 funding sources · 8,740 scheduled trips · Example Paratransit Co. (fictional)

Largest source
Source A
36% of trips
Top 3 share
78%
of trips
Completed trips
7,797
89% of scheduled
Cost range
$36–$47
per completed trip

Trips by funding source

Scheduled and completed

08581,7162,5743,432Source ASource BSource CSource DSource ESource F

■ Scheduled   ■ Completed

Cost per completed trip

Operating cost allocated by service hours

Source A$41.20Source B$38.70Source C$44.90Source D$36.10Source E$47.30Source F$39.80

Source summary

October

Funding sourceScheduledCompletedCancel rateCost / trip
Source A3,1202,8708%$41.20
Source B2,2101,96711%$38.70
Source C1,4801,24316%$44.90
Source D9809117%$36.10
Source E54043719%$47.30
Source F41036910%$39.80

Findings

  • Three sources carry most of the volume.
  • The two sources with the highest cancel rates also cost the most per completed trip.
  • Cost per trip tracks cancellations and trip length.

Actions

  • Use cost per completed trip in the next rate negotiation.
  • Bill late cancels where the contract allows.
  • Report these figures to each source monthly.
Every name and figure on this page is invented to show the report format. RRECKTEK Transit · rreck@rrecktek.com